Freshwave’s end-to-end bespoke design was specifically developed to fit precise design requirements from both the City of London Corporation and all four mobile network operators
Working with City of London Corporation and concession holder Cornerstone, we’ve installed or upgraded City Corporation street assets, such as lamp posts, so that the same asset can be used by multiple mobile network operators. Using small cell technology, which enhances 4G and 5G connectivity, the 10-site pilot runs along Queen Victoria Street and has been delivering an improved user experience for mobile users within the pilot area from December 2022. EE went live on the network in December 2022 and Virgin Media O2 went live in January 2023 with Vodafone planning to join the pilot soon.
Project type
200+
200+ node locations planned in the Square Mile, the densest deployment of small cells in the UK
3,360 km
3,360 km of dark fibre by Netomnia deployed across the Square Mile as part of the network
300k+
300,000+ people travel to the Square Mile to work
A place rich in history looks to the future
If the pilot is successful, the ambition is for a City-wide deployment that will deliver faster 4G and 5G mobile connectivity speeds across the Square Mile.
Outdoor small cells
Outdoor small cells enhance mobile coverage in busy urban areas where the number of people and things using the signal may put too much demand on the nearest mast. The cells can often be added to existing street assets like lamp posts.

Read our next case study

Find out more about
Omni 4G/5G

Find out more about
Freshwave
Understand your building’s connectivity
Book a signal survey to see how indoor connectivity could be improved across your building.








